Objective: To view the status of the asset within the project life cycle.
Things To Consider:
- Asset Validation Status is specific to each asset type and is most commonly used during construction and commissioning of a property OR during asset data collection.
- Validation requires step-by-step manual progression through the workflow.
- Some checks are automatic (e.g. 'user entered'), while others require manual check off.
- All validation steps are recorded with timestamp and UserID.
- User Permissions
Steps: